Product & Pricing Guide
Find the right solution for your outdoor space.
Choose the products you’re interested in. We’ll prepare an estimate based on your dimensions, materials, configuration and site conditions. All quotations are in Malaysian Ringgit (RM).
| SKU | Product | Pricing |
|---|---|---|
| AW-01 | Premium Architectural Awning | Quoted by size and configuration |
| AW-02 | Aluminium Composite Panel Awning | Quoted by size and configuration |
| AW-03 | Skylight Glass Awning | Quoted by size and configuration |
| AW-04 | PU Metal Deck Awning | Quoted by size and configuration |
| GT-01 | Modern Gate | Quoted by size and configuration |
| OF-01 | Parcel Station | Quoted by size and configuration |
| OF-02 | Bicycle Storage System | Quoted by size and configuration |
| OF-03 | Oversized Shoe Rack | Quoted by size and configuration |
| OF-04 | EV Charging Station Enclosure / Stand | Quoted by size and configuration |
Project estimate = Product base price + Site-specific work + Selected accessories / Additional items
For products priced by area: confirmed chargeable area × applicable unit rate.
For products priced per set: price for the selected size and configuration × quantity.
Your quotation will explain the pricing unit, measurement method and scope of work.
| Installation Level | Typical Site Conditions | How It Affects Your Estimate |
|---|---|---|
| Level 1 · Standard Installation | Easy access, suitable mounting surfaces, standard working height and conventional fixing methods | Priced within the agreed standard installation scope. Installation items already included will not be charged twice. |
| Level 2 · Additional Work Required | Partial removal of existing structures, mounting adjustments, additional drainage connections or restricted access for moving materials | Additional labour, materials or transport costs are listed separately. |
| Level 3 · Complex Installation | Work at height, large spans, lifting equipment, complex structures or significant site restrictions | The site and installation method are assessed first. Special equipment, structural work and labour are then itemised. |
These levels explain installation complexity; they do not carry a fixed percentage surcharge. Skytruss will assess your site and explain the relevant work and costs in your quotation. You do not need to select a level yourself.
Illustrative example only — these figures are not prices for any specific SKU.
| Item | Example Amount |
|---|---|
| Product and standard installation | RM 5,000 |
| Level 2 site work: partial removal and mounting adjustments | RM 600 |
| Customer-selected accessories | RM 300 |
| Example subtotal, before any applicable taxes | RM 5,900 |